News
02 Nov, 2019
The Nugegoda flyover bridge will be temporarily closed for renovations from today, the Police said.
The pre-fabricated flyover at Nugegoda was declared open in January 2009 after being constructed within a period of around three and half months.
The flyover has two lanes and is 261 metres long and 8.5 metres wide.
Recommended For You
Colombo Gazette is a leading news and entertainment website, covering stories related to Sri Lanka. The content consists of text based news, photos and videos and is linked to social media websites including Facebook, Twitter and Instagram, to provide a wider coverage for its stories.
Copyright © 2026 Colombo Gazette. All rights reserved.